Surface Preparation Before Exterior Painting: The 7 Steps Contractors Skip
Exterior surface preparation involves seven steps: check moisture, remove loose material, wash off dirt and chalk, treat algae or fungus, fill cracks, allow full drying, then mask surrounding surfaces. New plaster needs 21-28 days of curing before painting to let alkalinity settle.
